As-built plans (engineering, maintenance, and operations scheduled item), 1957-[ongoing].

ArchivalResource

As-built plans (engineering, maintenance, and operations scheduled item), 1957-[ongoing].

The Massachusetts Turnpike Authority is responsible for the maintenance and operation of the Massachusetts Turnpike, Boston extension, and Callahan Tunnel to East Boston, all of which it constructed, and of the Sumner Tunnel from East Boston. As-built plans are kept by its engineering, maintenance, and operations unit to document all construction for reference in case of future construction or reconstruction.

<80 cubic ft.>

Related Entities

There are 1 Entities related to this resource.

Massachusetts Turnpike Authority

http://n2t.net/ark:/99166/w66t5ghc (corporateBody)

The Massachusetts Turnpike Authority is responsible for the maintenance and operation of the Massachusetts Turnpike, Boston extension, and Callahan Tunnel to East Boston, all of which it constructed, and of the Sumner Tunnel from East Boston. Planning for the demolition of a related road system, the Boston central artery, known officially as the John F. Fitzgerald Expressway, and its replacement with an underground central artery, began in 1982. The Central Artery/Tunnel Project, known informall...