London and Birmingham Railway

Biographical notes:

The London and Birmingham Railway was sanctioned in 1833, and the Company appointed Robert Stephenson as chief engineer. Its construction was dogged by much opposition. The 112 mile long London to Birmingham line took 20,000 men nearly five years to build. The total cost of building the railway was £5,500,000 (£50,000 a mile). The railway was opened in stages and finally completed on 17 September 1838. The line started at Birmingham's Curzon Street Station and finished at Euston Station in London.

From the guide to the London and Birmingham Railway, 1830-1832, 1830-1832, (Senate House Library, University of London)

From the guide to the London and Birmingham Railway, 1836 February, (Senate House Library, University of London)

From the guide to the London and Birmingham Railway, [1837], c1837, (Senate House Library, University of London)

Links to collections

Comparison

This is only a preview comparison of Constellations. It will only exist until this window is closed.

  • Added or updated
  • Deleted or outdated

Information

Permalink:
SNAC ID:

Subjects:

  • Construction industry
  • Employment
  • Industry
  • Railway construction
  • Railway transport
  • Transport
  • Transport infrastructure

Occupations:

not available for this record

Places:

  • London England (as recorded)
  • Birmingham Warwickshire England (as recorded)
  • Tring Hertfordshire England (as recorded)
  • London England (as recorded)
We use cookies to understand how you use our site and to improve your experience. By continuing to use our site, you accept our use of cookies, Privacy Policy and Terms of Use.