Hardaway Contracting Co. (Columbus, Ga.)
The Hardaway Contracting Company won the contract to build Lock and Dam No. 17 on the Black Warrior River in Tuscaloosa County (Ala.). This Columbus (Ga.) contracting company began work on the locks and dam in 1911 and work was completed on Dec. 23, 1914. The dam was named the Bankhead Lock and Dam in honor of John Hollis Bankhead, U. S. senator from Alabama.
From the description of Bankhead Lock and Dam construction photographs, 1914. (Unknown). WorldCat record id: 122498283
Role | Title | Holding Repository | |
---|---|---|---|
creatorOf | Hardaway Contracting Co. (Columbus, Ga.). Bankhead Lock and Dam construction photographs, 1914. | Alabama Department of Archives and History |
Role | Title | Holding Repository |
---|
Filters:
Relation | Name | |
---|---|---|
associatedWith | United States. Army. Corps of Engineers. | corporateBody |
Place Name | Admin Code | Country | |
---|---|---|---|
Alabama | |||
Tuscaloosa (Ala.) | |||
Black Warrior River (Ala.) |
Subject |
---|
Construction |
Dams |
Locks (Hydraulic engineering) |
Occupation |
---|
Activity |
---|
Corporate Body