Jet Propulsion Laboratory (U.S.). Mars Observer Project.

Hide Profile

In 1980, the NASA Advisory Council formed the Solar System Exploration Committee (SSEC) to formulate a long-range program for planetary exploration. This program would build on the scientific strategies developed by the Committee on Lunar and Planetary Exploration of the National Academy of Science's Space Science Board, and would also recognize the fiscal constraints likely to apply to NASA's science program in the foreseeable future.

As a result of extensive investigation of scientific priorities, mission opportunities, launch vehicle and technology capabilities, and overall program planning for affordability and basic supporting research, the SSEC's initial recommendation in 1983 was establishment of a Core program for planetary exploration through the year 2000.

This Core program consisted of two elements: first, the basic supporting activities of research mission operations, technology development and advance planning, and second, the Core planetary missions program. Two distinct series of missions were recommended: the Planetary Observers for exploration of the inner solar system, and missions utilizing the Mariner Mark II spacecraft for exploration of the outer solar system.

In 1985, the Announcement of Opportunity culminated a FY85 new start for the Mars Observer Project. Four years later, the FY89 NASA Budget established the estimate for the development costs (through launch plus 30 days) for Mars Observer at $419M in real year dollars excluding the upper stage or injection capability, Space Transportation System (STS) integration and STS launch costs, and the Jet Propulsion Laboratory (JPL) institutional costs of Tracking and Data Acquisition and of the Space Flight Operations Center. The Mission Operations and Data Analysis phase of the project was estimated at 79.9M in real year dollars.

The Mars Observer was the first of the Planetary Observer missions, a series of low cost, modest scope missions for exploration of the inner solar system. MO was programmed to be the first mission returning to Mars since 1976. Spacecraft development costs were by basing design on civilian and military Earth-orbiting spacecraft designs. General Electric's Astro-Space Division produced the Mars Observer spacecraft carrier vehicle, or bus. The Titan III launch vehicle was provided by Martin Marietta Commercial Titan, Inc.; the Transfer Orbit Stage was supplied by the Orbital Sciences Corporation and built by the Martin Marietta Astronautics.

Mars Observer was launched on September 25, 1992, aboard a Titan III launch vehicle from Cape Canaveral Air Force Station in Florida. The objective of the Mars Observer mission was to place a spacecraft in orbit about Mars for one Martian year, providing a nadir-oriented platform from which to carry out a series of cost-effective experiments and measurements designed to meet the scientific objectives of the mission.

The objectives were to perform an extended orbital study of the Martian surface, atmosphere, gravitational and magnetic fields using a spacecraft operating at an altitude of 361 km and an inclination of 93°. Mars Observer had completed an 11-month, 711-million-kilometer (442-million-mile) journey to Mars and was within three days of entering orbit around the planet when it fell silent at about 1:00 Universal Time on August 22, 1993. (6 p.m. Pacific Daylight Time on August 21st).

The spacecraft was about to begin pressurizing its fuel tanks pressurizing its fuel tanks in preparation for the August 24th orbit-insertion maneuver when its transmitters were turned off and the spacecraft was never heard from again. It was believed that Mars Observer developed a leak in its propulsion system sending it out of control. It was the first loss of an U.S. planetary mission in 27 years.

In conclusion of Mars Observer operations, JPL attempted the last realistic chance to validate that the spacecraft still existed and was properly operating-except for its telemetry transmitter. That occurred in late September, during a search for a beacon from a radio relay system onboard the spacecraft by radio astronomy antennas at Jodrell Bank in England, at Stanford University, and at the Goldstone tracking facility near Barstow.

"Had the spacecraft been in either of its predicted locations in orbit around Mars or in a flyby orbit around the Sun and had it been able to receive and process commands from the ground, we fully expected that a signal from its independent radio transmitter would have been detected," said Dr. Sam Dallas, Mars Observer mission manager.

While minimal support for ground-tracking of Mars Observer did continue through mid February, JPL had begun a Mars Recovery Study Team effort to explore the most cost-effective, low-risk ways of recovering the Mars Observer science during the next Mars launch opportunities in 1996, 1998 and 2000.

From the description of Mars Observer Problem / Failure Analysis Collection, 1989-1995. (Jet Propulsion Laboratory Library and Archives). WorldCat record id: 733102127

Archival Resources
Role Title Holding Repository
creatorOf Jet Propulsion Laboratory (U.S.). Mars Observer Project. Mars Observer Problem / Failure Analysis Collection, 1989-1995. Jet Propulsion Laboratory Library and Archives
Role Title Holding Repository
Relation Name
associatedWith Jet Propulsion Laboratory (U.S.). corporateBody
associatedWith Mars Observer Project (U.S.). corporateBody
associatedWith National Aeronautics and Space Administration (U.S.). corporateBody
Place Name Admin Code Country
Subject
Aerobraking
Documentation
Interplanetary spacecraft
Mars missions
Mars observer
Space probes
Unmanned spacecraft
Occupation
Activity

Corporate Body

Active 1989

Active 1995

Related Descriptions
Information

Permalink: http://n2t.net/ark:/99166/w6rp0d7n

Ark ID: w6rp0d7n

SNAC ID: 62868964