Seattle (Wash.). Engineering Dept.
Variant namesThe Seattle Engineering Dept. (SED) maintained the city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the city, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Dept. absorbed part of the Dept. of Public Utilities and in 1936 it assumed the responsibilities of the Dept. of Streets and Sewers and the Traffic Dept. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Dept. were consolidated in the Seattle Transportation Dept.
From the description of Seattle Engineering Dept. safety photographs, 1947-1987. (Unknown). WorldCat record id: 154691098
Begun in 1898 and completed over thirty years later, the Denny Hill Regrade leveled one of Seattle's steepest hills, connecting neighborhoods and facilitating traffic flow. Before the regrade, Second Ave. rose 190 feet in the twelve blocks between Pioneer Square and Lenora Ave., causing traffic and transportation problems in the area. The project began by flattening First Ave. between Pine St. and Denny Way. The sluiced-away dirt was dumped into Elliott Bay or used as filler on downtown streets. The leveling of the hill continued in 1906 and 1907; homeowners who refused to move had the hill sluiced away around them, leaving their houses on islands of dirt. In 1928, the remaining portion of the hill was leveled using electric steam shovels; the dirt and debris was carried to scows on Elliott Bay by means of large conveyor belts. By the end of the project in 1931, Denny Hill had been flattened and the Denny Regrade neighborhood was born.
From the description of Seattle Engineering Dept. Denny Hill Regrade photograph album, 1904-1929. (Unknown). WorldCat record id: 154691104
Maintained the city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility; in 1931 absorbed part of the Department of Public Utilities and in 1936 assumed the responsibilities of the the Depart of Streets and Sewers and the Traffic Department; in 1997 the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with Engineering Services Division of the Seattle Engineering Department and the Customer Service Call Center and Construction Engineering sections of City Light to form Seattle Public Utilities; traffic and transportation functions of the Engineering Department were consolidated in Seattle Transportation Department.
From the description of Interdepartmental memoranda, 1911-1912. (Unknown). WorldCat record id: 70963053
Located east of Tacoma, the Green- Duwamish River Basin covers 483 square miles. Originating in the Cascades, the Green River flows northwest and empties into Elliott Bay; the river turns into the Duwamish at the point where the Green and Black Rivers once converged. Flooding in the Green River Valley was once a costly problem; it affected not only personal property, including crop losses and planting delays for hundreds of farms, but also city property and state and county roads. In 1947, an average of $200,000 total annual losses was estimated. Loss of human lives and of livestock also occurred during flooding periods. Possible methods for flood control included building a dam and reservoir on the Green River, constructing dykes, or excavating a river channel to carry flood waters. The dam, if "economically feasible," would be paid for by federal dollars. The Seattle Chamber of Commerce supported federal flood control, citing not only the high cost of flood damages, but also the potential for further agricultural and industrial development of the Duwamish basin if flooding were brought under control. Government engineers also supported the idea of a dam; a project using federal funds to construct a dam on the Green River in Eagle Gorge was adopted by the U.S. Congress in 1950. Originally known as the Eagle Gorge Dam, the dam was renamed Howard Hanson Dam, after the Seattle Chamber of Commerce Rivers and Harbors Committee chairman who was instrumental in the flood control project, when Hanson died in 1957. The dam was completed in 1962, and extensive development of the valley, both agricultural and industrial, soon followed. Although flood control remains the primary function of the Howard Hanson Dam, it is also used for irrigation and water supply.
From the description of Duwamish-Green River flood control project records, 1922-1956. (Unknown). WorldCat record id: 123945293
The Seattle Engineering Department (SED) maintained the city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the city, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Dept. absorbed part of the Dept. of Public Utilities and in 1936 it assumed the responsibilities of the Dept. of Streets and Sewers and the Traffic Division. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Dept. were consolidated in the Seattle Transportation Dept.
From the description of Seattle Engineering Dept. engineering vehicles and equipment photograph albums, 1920-1960. (Unknown). WorldCat record id: 154691045
Maintained city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility; 1931 absorbed part of the Dept. of Public Utilities and in 1936 assumed the responsibilities of the Dept. of Streets and Sewers; merged with Water Dept. and Solid Waste Utility to form Seattle Public Utilities.
From the description of Tolt River water supply studies, 1936-1966. (Unknown). WorldCat record id: 70963333
Portraits taken by the Engineering Dept. photographer.
From the description of Seattle Engineering Dept. mayors' portraits, 1869-2004. (Unknown). WorldCat record id: 154691136
The Seattle Engineering Dept. (SED) maintained the city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the city, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Dept. absorbed part of the Dept. of Public Utilities and in 1936 it assumed the responsibilities of the Dept. of Streets and Sewers and the Traffic Dept. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water Departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Dept. were consolidated in the Seattle Transportation Dept.
From the description of Seattle Engineering Dept. bridge photographs, 1910-1932. (Unknown). WorldCat record id: 154691072
Maintained the city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility; in 1931 absorbed part of the Department of Public Utilities and in 1936 assumed the responsibilities of the the Depart of Streets and Sewers and the Traffic Department; in 1997 the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with Engineering Services Division of the Seattle Engineering Department and the Customer Service Call Center and Construction Engineering sections of City Light to form Seattle Public Utilities; traffic and transportation functions of the Engineering Department were consolidated in Seattle Transportation Department.
From the description of City engineer's correspondence, 1890-1898. (Unknown). WorldCat record id: 70963052
The Seattle Engineering Department (SED) maintained the city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of city surveyor was created in 1873 to survey the city, establish boundaries and street grades, and administer condemnation processes. This position was renamed city engineer in 1890. In 1931, the Engineering Dept. absorbed part of the Dept. of Public Utilities, and in 1936, it assumed the responsibilities of the Dept. of Streets and Sewers and the Traffic Dept. In 1997, the water, solid waste, drainage, and wastewater utilities from the engineering and water departments were merged with the Engineering Services Division of SED and the customer service call center and construction engineering sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Dept. were consolidated in the Seattle Transportation Dept. Utility franchises grant permission to the grantee to use sidewalk, street, underground or air space owned by the city. The franchises are granted for tunnels, underground fuel tanks, pipes, overhead bridges, pipes, overhead wires, and bridges. Grantees are frequently businesses.
From the description of Seattle Engineering Department utility franchise records, 1896-1985 (bulk 1908-1973). (Unknown). WorldCat record id: 71208663
Maintained city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility; 1931 absorbed part of the Dept. of Public Utilities and in 1936 assumed the responsibilities of the Dept. of Streets and Sewers; merged with Water Dept. and Solid Waste Utility to form Seattle Public Utilities.
From the description of Cedar River water system correspondence, 1901. (Unknown). WorldCat record id: 70963329
The Mayor is the chief executive officer of the City with responsibilities for law enforcement, appointing department heads, administering City departments and programs, and preparing and executing the City budget. Seattle's original Charter (1869) created the position of Mayor who served as ex-officio President of the Common Council. The 1875 Charter gave the Mayor a vote on Council. That was amended in 1886 to provide for a tie-breaking vote only. The 1890 Charter completely separated the Executive and Legislative branches. Mayoral terms were set at 4 years by the 1946 City Charter.
From the guide to the Seattle Mayors' Portraits, 1869-2004, (Seattle Municipal Archives)
The Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Department absorbed part of the Department of Public Utilities and in 1936 it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
From the guide to the Seattle Local Climatological Monthly Summary, 1951-1983, (City of Seattle Seattle Municipal Archives)
From the guide to the Seattle Meteorological Summaries, 1908-1951, (City of Seattle Seattle Municipal Archives)
From the guide to the Seattle Engineering Department Negatives, 1910-1994, (City of Seattle Seattle Municipal Archives)
From the guide to the Lake Washington Floating Bridge Construction Album, 1939-1940, (City of Seattle Seattle Municipal Archives)
From the guide to the Seattle Engineering Department Unrecorded Subject Files, 1890-1990, (City of Seattle Seattle Municipal Archives)
From the guide to the Street Trees and Landscaping Records, 1957-2001, 1966-1996, (City of Seattle Seattle Municipal Archives)
The Engineering Department maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Department absorbed part of the Department of Public Utilities and in 1936 it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department
From the guide to the Seattle Engineering Department Property Ownership Lists and Abstracts, 1891-1904, (City of Seattle Seattle Municipal Archives)
The Lake City Sewer District served the community north of 85th Street. Seattle annexed 60 percent of the District area in 1953. The City assumed maintenance for the system while the District continued to provide service in the annexed area. In 1974-1975, the City purchased the remaining District assets.
From the guide to the Lake City Sewer District Records, 1949-1975, (City of Seattle Seattle Municipal Archives)
Seattle traffic issues fell under the jurisdiction of the Department of Streets and Sewers during the first three decades of the 20th Century. With the recognition of growing traffic engineering needs, the Office of Traffic Engineer was established within the Department in1930. The Department of Streets and Sewers was abolished by City Charter Amendment in 1936 and most of its functions absorbed by the Engineering Department. The Office of the Traffic Engineer became a division within the Department. When the functions of the Engineering Department were reorganized in 1997, the traffic engineering and transportation functions were consolidated in the newly formed Seattle Transportation Department.
From the guide to the Traffic Engineering Subject Files, 1926-1988, (City of Seattle Seattle Municipal Archives)
The Seattle Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Department absorbed part of the Department of Public Utilities and in 1936 it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
From the guide to the Safety Photographs, 1947-1987, (Seattle Municipal Archives)
From the guide to the Vehicles and Equipment Photograph Albums, 1920-1952, (Seattle Municipal Archives)
From the guide to the Seattle Bridges Photograph Album, 1910-1932, (Seattle Municipal Archives)
Maintained the city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility; in 1931 absorbed part of the Department of Public Utilities and in 1936 assumed the responsibilities of the the Depart of Streets and Sewers and the Traffic Department; in 1997 the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with Engineering Services Division of the Seattle Engineering Department and the Customer Service Call Center and Construction Engineering sections of City Light to form Seattle Public Utilities; traffic and transportation functions of the Engineering Department were consolidated in Seattle Transportation Department.
From the description of Engineering Department Annual Reports, 1899-1985. (Unknown). WorldCat record id: 70966322
The Seattle Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890.
In 1931, the Engineering Department absorbed part of the Department of Public Utilities, and in 1936, it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
From the guide to the Engineering Department R.H. Thomson Freeway Records, 1958-1977, (City of Seattle Seattle Municipal Archives)
The Seattle Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931, the Engineering Department absorbed part of the Department of Public Utilities, and in 1936, it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department.
In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
Utility franchises grant permission to the grantee to use sidewalk, street, underground or air space owned by the City. Utility franchises are granted for tunnels, underground fuel tanks, pipes, overhead bridges, pipes, overhead wires, and bridges. Grantees are frequently businesses.
From the guide to the Utility Franchise Records, 1896-1983, 1908-1973, (Seattle Municipal Archives)
The Seattle Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931, the Engineering Department absorbed part of the Department of Public Utilities, and in 1936, it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department.
In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
Transportation from West Seattle to downtown Seattle had been problematic for decades; until the 1970s, two drawbridges were the major link between the two areas of the city. Although planning was authorized in the 1970s, the project was delayed until June 11, 1978, when the freighter Antonio Chavez struck and damaged one of the drawbridges, thereby forcing action on the issue. A state of emergency was declared, and emergency funds from the Department of Transportation and from Congress were added to existing funds for a bridge replacement.
In 1979, the City Council passed a resolution stating that the bridge damage caused "severe traffic disruption, congestion, and unsafe conditions" and approved a two-phase plan for a new West Seattle Freeway Bridge. Phase I would be a six-lane high-level bridge and Phase II would be a two-lane low-level bridge. Later in 1979, Ordinance 108643 authorized property acquisition, construction, and general obligation bonds to assist in funding the bridge's construction. The ordinance cited the importance of an improved bridge in assisting the development of the Harbor Island business area and Duwamish Industrial area. The City Council stated that the bridge design would "more effectively serve the needs of the City" by improving traffic flow, providing access to West Seattle and Harbor Island, improving safety on the bridge, and even reducing air pollution by cutting down on idling time as a result of the "uninterrupted flow of traffic." King County, the City and Port of Seattle, and the State of Washington would all contribute to bridge funding.
Construction on the West Seattle Freeway Bridge began in 1981, and the Phase I high-level bridge opened to traffic in 1984.
From the guide to the West Seattle Freeway Bridge Construction Photographs and Slides, 1980-1983, (Seattle Municipal Archives)
The Seattle Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890.
In 1931, the Engineering Department absorbed part of the Department of Public Utilities, and in 1936, it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
From the guide to the Seattle Weather Data, 1892-1983, (City of Seattle Seattle Municipal Archives)
The Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Department absorbed part of the Department of Public Utilities and in 1936 it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
In October 1928, work began on the repaving of the deteriorating brick pavement of Third Avenue in downtown Seattle. The four-month project took place during the autumn, presenting potential weather problems, and was further complicated by the busy holiday shopping season, when both car and pedestrian traffic were heavy. Fortunately, the weather was favorable, and construction proceeded with speed and efficiency. In fact, one-way traffic was able to continue on Third Avenue during the construction, and much of the work was done before the Christmas shopping rush, opening streets up to traffic.
The repaving project was completed on February 2, 1929, and was considered "...a rush work project that may be without a parallel, considering the season of the year during which the work was done."
From the guide to the Third Avenue Repaving Photograph Album, 1923-1929, (Seattle Municipal Archives)
Located east of Tacoma, the Green-Duwamish River Basin covers 483 square miles. Originating in the Cascades, the Green River flows northwest and empties into Elliott Bay; the river turns into the Duwamish at the point where the Green and Black Rivers once converged.
Flooding in the Green River Valley was once a costly problem; it affected not only personal property, including crop losses and planting delays for hundreds of farms, but also city property and state and county roads. In 1947, an average of $200,000 total annual losses was estimated. Loss of human lives and of livestock also occurred during flooding periods. Possible methods for flood control included building a dam and reservoir on the Green River, constructing dykes, or excavating a river channel to carry flood waters. The dam, if "economically feasible," would be paid for by federal dollars. The Seattle Chamber of Commerce supported federal flood control, citing not only the high cost of flood damages, but also the potential for further agricultural and industrial development of the Duwamish basin if flooding were brought under control.
Government engineers also supported the idea of a dam; a project using federal funds to construct a dam on the Green River in Eagle Gorge was adopted by Congress in 1950. Originally known as the Eagle Gorge Dam, the dam was renamed Howard Hanson Dam, after the Seattle Chamber of Commerce Rivers and Harbors Committee chairman who was instrumental in the flood control project, when Hanson died in 1957. The dam was completed in 1962, and extensive development of the valley -- both agricultural and industrial -- soon followed. Although flood control remains the primary function of the Howard Hanson Dam, it is also used for irrigation and water supply.
From the guide to the Duwamish and Green Rivers Flood Control Studies, 1922-1956, (Seattle Municipal Archives)
The Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Department absorbed part of the Department of Public Utilities and in 1936 it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
Begun in 1898 and completed over thirty years later, the Denny Hill Regrade leveled one of Seattle's steepest hills, connecting neighborhoods and facilitating traffic flow. Before the regrade, Second Avenue rose 190 feet in the twelve blocks between Pioneer Square and Lenora Avenue, causing traffic and transportation problems in the area. The project began by flattening First Avenue between Pine Street and Denny Way. The sluiced-away dirt was dumped into Elliott Bay or used as filler on downtown streets. The leveling of the hill continued in 1906 and 1907; homeowners who refused to move had the hill sluiced away around them, leaving their houses on islands of dirt.
In 1928, the remaining portion of the hill was leveled using electric steam shovels; the dirt and debris was carried to scows on Elliott Bay by means of large conveyor belts. By the end of the project in 1931, Denny Hill had been flattened and the Denny Regrade neighborhood was born.
From the guide to the Denny Hill Regrade Photograph Albums, 1904-1929, (Seattle Municipal Archives)
The Seattle Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890.
In 1931, the Engineering Department absorbed part of the Department of Public Utilities, and in 1936, it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
From the guide to the Seattle Engineering Department Strategic Action Plan Task Force Records, 1995-1996, (City of Seattle Seattle Municipal Archives)
The Seattle Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890.
In 1931, the Engineering Department absorbed part of the Department of Public Utilities, and in 1936, it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
From the guide to the Seattle Engineering Department Damage Cases, 1891-2003, 1914-1987, (City of Seattle Seattle Municipal Archives)
The Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Department absorbed part of the Department of Public Utilities and in 1936 it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
Court Engineering, a division of the Engineering Department, provided engineering services primarily to the Law and Legislative Departments until the early 1990s. Court Engineering researched condemnation ordinances, damage suits, appeals from assessment rolls, and suits to quiet title. In the early years of the Engineering Department, Court Engineering was also responsible for surveying land for various purposes such as the Cedar River Watershed and land around Newcastle for a water reservoir. Work relating to condemnations included regrades, widening, sewers, and street extensions. As the City grew, court work related to bridges, city facilities, and arterial highways became a part of the scope of their work. Also known as the Legal Engineering Division, or the Court and Right of Way section, the division worked with City Council and Corporation Counsel to draft agreements with other governmental agencies and researched legislation pertaining to Engineering Department functions. Work also included obtaining necessary franchises and permits and assuring compliance with environmental laws.
From the guide to the Court Engineering Records, 1890-1982, (Seattle Municipal Archives)
Maintained city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility; 1931 absorbed part of the Dept. of Public Utilities and in 1936 assumed the responsibilities of the Dept. of Streets and Sewers; merged with Water Dept. and Solid Waste Utility to form Seattle Public Utilities.
From the description of Condemnation files, 1888-1978. (Unknown). WorldCat record id: 70925010
Maintained city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility; 1931 absorbed part of the Dept. of Public Utilities and in 1936 assumed the responsibilities of the Dept. of Streets and Sewers; merged with Water Dept. and Solid Waste Utility to form Seattle Public Utilities.
From the description of Skagit River power supply correspondence, 1918-1931. (Unknown). WorldCat record id: 70963330
The Seattle Engineering Dept. maintained the city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the city, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In October 1928, work began on the repaving of the deteriorating brick pavement of Third Avenue in downtown Seattle. The four-month project took place during the autumn, presenting potential weather problems, and was further complicated by the busy holiday shopping season, when both car and pedestrian traffic were heavy. Fortunately, the weather was favorable, and construction proceeded with speed and efficiency. In fact, one-way traffic was able to continue on Third Avenue during the construction, and much of the work was done before the Christmas shopping rush, opening streets up to traffic. The repaving project was completed on 2 Feb. 1929, and was considered " ... a rush work project that may be without a parallel, considering the season of the year during which the work was done."
From the description of Seattle Engineering Department Third Avenue repavement photograph album, 1923-1929. (Unknown). WorldCat record id: 75272124
Maintained city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility; 1931 absorbed part of the Dept. of Public Utilities and in 1936 assumed the responsibilities of the Dept. of Streets and Sewers; merged with Water Dept. and Solid Waste Utility to form Seattle Public Utilities.
From the description of Water works distribution system letterpress book, 1902-1908. (Unknown). WorldCat record id: 70963332
Maintained city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility; 1931 absorbed part of the Dept. of Public Utilities and in 1936 assumed the responsibilities of the Dept. of Streets and Sewers; merged with Water Dept. and Solid Waste Utility to form Seattle Public Utilities.
From the description of Reports of the city engineer, 1894-1910. (Unknown). WorldCat record id: 70925008
Transportation from West Seattle to downtown Seattle had been problematic for decades; until the 1970s, two drawbridges were the major link between the two areas of the city. Although planning was authorized in the 1970s, the project was delayed until 11 June 1978, when the freighter Antonio Chavez struck and damaged one of the drawbridges, thereby forcing action on the issue. A state of emergency was declared, and emergency funds from the Dept. of Transportation and from the U.S. Congress were added to existing funds for a bridge replacement. In 1979, the City Council passed a resolution stating that the bridge damage caused "severe traffic disruption, congestion, and unsafe conditions" and approved a two-phase plan for a new West Seattle Freeway Bridge. Phase I would be a six-lane high-level bridge and Phase II would be a two-lane low-level bridge. Later in 1979, Ordinance 108643 authorized property acquisition, construction, and general obligation bonds to assist in funding the bridge's construction. The ordinance cited the importance of an improved bridge in assisting the development of the Harbor Island business area and Duwamish Industrial area. The City Council stated that the bridge design would "more effectively serve the needs of the City" by improving traffic flow, providing access to West Seattle and Harbor Island, improving safety on the bridge, and even reducing air pollution by cutting down on idling time as a result of the "uninterrupted flow of traffic." King County, the city and Port of Seattle, and the state of Washington would all contribute to bridge funding. Construction on the West Seattle Freeway Bridge began in 1981, and the Phase I high-level bridge opened to traffic in 1984.
From the description of West Seattle Freeway Bridge construction photograph and slide collection, 1980-1983. (Unknown). WorldCat record id: 154691051
Maintained city's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility; 1931 absorbed part of the Dept. of Public Utilities and in 1936 assumed the responsibilities of the Dept. of Streets and Sewers; merged with Water Dept. and Solid Waste Utility to form Seattle Public Utilities.
From the description of Water system correspondence, 1890-1931. (Unknown). WorldCat record id: 70963331
Responsible for the planning, construction, repair, and cleaning of the city's streets, sidewalks, and sewers; under the Engineering Dept.; abolished in 1936 and became the Maintenance Division of the Engineering Dept.
From the description of Cedar Falls Electric Plant correspondence, 1904-1913. (Unknown). WorldCat record id: 70925013
Role | Title | Holding Repository |
---|
Filters:
Place Name | Admin Code | Country | |
---|---|---|---|
Seattle (Wash.) | |||
Interstate 5 | |||
Green River (King County, Wash.) | |||
Denny Hill (Wash.) | |||
Seattle (Wash.) | |||
West Seattle Bridge (Seattle, Wash.) | |||
Seattle (Wash.) | |||
Seattle (Wash.) | |||
West Seattle Bridge (Seattle, Wash.) | |||
Seattle (Wash.) | |||
Seattle (Wash.) | |||
Duwamish River Watershed (Wash.) | |||
Seattle (Wash.) | |||
Skagit River (B.C. and Wash.) | |||
Washington (State) | |||
Seattle (Wash.) | |||
Seattle (Wash.). | |||
Elliott Bay (Wash.) | |||
Seattle (Wash.) | |||
Seattle (Wash.) | |||
Seattle (Wash.) | |||
Seattle (Wash.) | |||
Cedar River Watershed (King County, Wash.) | |||
Third Avenue (Seattle, Wash.) | |||
Tolt River (Wash.) | |||
Lake Washington Bridge (Mercer Island and Seattle, Wash.) | |||
Seattle (Wash.) | |||
Seattle (Wash.) | |||
Railroad Ave. (Seattle, Wash.) | |||
Green River Watershed (King County, Wash.) | |||
South Park (Seattle, Wash.) | |||
Washington--Seattle | |||
Ballard (Seattle, Wash.) | |||
Cedar River (King County, Wash.) | |||
Denny Hill (Wash.) | |||
Duwamish River (Wash.) | |||
Tolt River Watershed (Wash.) | |||
Seattle (Wash.) | |||
Washington (State)--Duwamish River | |||
West Seattle (Seattle, Wash.) | |||
Washington State--Seattle | |||
Pike Street (Seattle, Wash.) | |||
Denny Regrade (Seattle, Wash.) | |||
Washington (State)--Seattle | |||
Seattle (Wash.) | |||
Duwamish River (Wash.) | |||
Seattle (Wash.) | |||
Seattle (Wash.) | |||
Georgetown (Seattle, Wash.) | |||
Seattle (Wash.) | |||
Columbia City (Seattle, Wash.) | |||
Alaskan Way Viaduct (Seattle, Wash.) | |||
Duwamish River (Wash.) | |||
Interstate 5 |
Subject |
---|
Floods |
Traffic accidents |
Traffic accidents |
Traffic accidents |
Administrative agencies Reorganization |
Air-compressors |
Alaskan Way Viaduct (Seattle, Wash.) |
Atmospheric temperature |
Aurora Avenue (Seattle and Shoreline, Wash.) |
Automobiles |
Automobiles |
Award presentations |
Award presentations |
Billboards |
Bricklaying |
Bridge construction |
Bridges |
Bridges |
Bridges |
Bridges |
Bridges |
Bridges |
Business enterprises |
Business enterprises |
Business enterprises |
Business planning |
Bus lanes |
Cedar River Watershed (King County, Wash.) |
Central business districts |
Century 21 Exposition (1962 : Seattle, Wash.) |
Cities and towns |
City planning |
Civic improvement |
Civic improvement |
Civil defense |
Civil Procedure and Courts |
Construction |
Construction equipment |
Construction equipment |
Construction projects |
Construction workers |
Cost estimates |
Dump trucks |
Dump trucks |
Electric lines |
Electric railroads |
Elevated highways |
Eminent domain |
Environmental Conditions |
Environmental protection |
Express highways |
Express highways |
Farm produce |
Fire department |
Flood control |
Flood control |
Flood control |
Footbridges |
Footbridges |
Forward Thrust (Seattle, Wash.) |
Politics and government |
Government purchasing |
Grading (Earthwork) |
Grading (Earthwork) |
Historic districts |
Public hospitals |
Hotels |
Hydroelectric power plants |
Hydroelectric power plants |
Hydroelectric power plants |
Jails |
Labor supply |
Lake Washington Ship Canal (Seattle, Wash.) |
Landslides |
Land tenure |
Land use |
Litigation |
Locomotives |
Maintenance |
Maintenance |
Maps |
Markets |
Markets |
Mayors |
Monorail railroads |
Monorail railroads |
Monorail railroads |
Monorail railroads |
Municipal engineering |
Municipal engineering |
Municipal engineering |
Municipal engineering |
Municipal engineers |
Municipal franchises |
Municipal franchises |
Municipal government |
Municipal officials and employee |
Municipal services |
Municipal water supply |
Municipal water supply |
Municpial government |
Neighborhood |
Parks and Playgrounds |
Pavements |
Pedestrians |
Photographs |
Pickup trucks |
Pickup trucks |
Pipelines |
Pipelines |
Precipitation (Meteorology) |
Real property |
Real property |
Public use |
Public utilities |
Public utilities |
Public works |
Public works |
Public works |
Railroads |
Railroads |
Railroads |
Railroad terminals |
Railroad tracks |
Rain and rainfall |
Rainfall frequencies |
Recycling (Waste, etc.) |
Refuse and refuse disposal |
Refuse disposal facilities |
Reservoirs |
R.H. Thomson Freeway (Seattle, Wash.) |
Roads |
Safety |
Safety measures |
Seattle |
Sea-walls |
Sewage |
Sewage disposal plants |
Sewerage |
Sewerage |
Sewer districts |
Sewers |
Shipment of goods |
Soils |
Soils |
Stables |
Standpipes |
Storm sewers |
Strategic planning |
Streets |
Streets |
Streets |
Streets |
Streetscapes (Urban design) |
Submerged lands |
Tolt River Watershed (Wash.) |
Traffic circles |
Traffic engineering |
Traffic engineering |
Traffic safety |
Trailers |
Transportation |
Transportation |
Transportation, Military |
Trees in cities |
Truck farmers |
Tunnels |
Tunnels |
Union Bay (Wash.) |
Urban landscape architecture |
Viaducts |
Viaducts |
Viaducts |
Viaducts |
World War, 1914-1918 |
Washington Park Arboretum |
Washington (State) |
Waste minimization |
Water |
Water and Water Rights |
Water pipes |
Water-supply engineering |
Water utilities |
Water utilities |
Water utilities |
Waterways |
Weather |
Weyerhaeuser Company |
Weyerhaeuser Timber Company |
Women mayors |
Wrecking |
Occupation |
---|
Construction workers |
Mayors |
Municipal engineers |
Women mayors |
Activity |
---|
Corporate Body
Active 1947
Active 1987
Active 1904
Active 1929
Active 1911
Active 1912
Active 1922
Active 1956
Active 1920
Active 1960
Active 1936
Active 1966
Active 1869
Active 2004
Active 1910
Active 1932
Active 1917
Active 1921
Active 1890
Active 1898
Active 1890
Active 1986
Active 1897
Active 1912
Active 1896
Active 1985
Active 1899
Active 1985
Active 1888
Active 1978
Active 1918
Active 1931
Active 1923
Active 1929
Active 1902
Active 1908
Active 1894
Active 1910
Active 1980
Active 1983
Active 1906
Active 1924
Active 1890
Active 1931
Active 1904
Active 1913