London and Birmingham Railway
Name Entries
corporateBody
London and Birmingham Railway
Name Components
Name :
London and Birmingham Railway
Genders
Exist Dates
Biographical History
The London and Birmingham Railway was sanctioned in 1833, and the Company appointed Robert Stephenson as chief engineer. Its construction was dogged by much opposition. The 112 mile long London to Birmingham line took 20,000 men nearly five years to build. The total cost of building the railway was £5,500,000 (£50,000 a mile). The railway was opened in stages and finally completed on 17 September 1838. The line started at Birmingham's Curzon Street Station and finished at Euston Station in London.
eng
Latn
External Related CPF
https://viaf.org/viaf/159550663
https://www.worldcat.org/identities/lccn-n88108823
https://id.loc.gov/authorities/n88108823
Other Entity IDs (Same As)
Sources
Loading ...
Resource Relations
Loading ...
Internal CPF Relations
Loading ...
Languages Used
Subjects
Construction industry
Employment
Industry
Railway construction
Railway transport
Transport
Transport infrastructure
Nationalities
Activities
Occupations
Legal Statuses
Places
London England
AssociatedPlace
Birmingham Warwickshire England
AssociatedPlace
Tring Hertfordshire England
AssociatedPlace
London England
AssociatedPlace
Convention Declarations
<conventionDeclaration><citation>VIAF</citation></conventionDeclaration>