Massachusetts. Metropolitan District Commission. Construction Division.

Name Entries

Information

corporateBody

Name Entries *

Massachusetts. Metropolitan District Commission. Construction Division.

Computed Name Heading

Name Components

Name :

Massachusetts. Metropolitan District Commission. Construction Division.

Genders

Exist Dates

Exist Dates - Date Range

1876

active 1876

Active

1970

active 1970

Active

Show Fuzzy Range Fields

Biographical History

Responsibility for operating a system of waterworks and sewers in Boston and surrounding communities was exercised successively by the Metropolitan Water Board (1895-1901) and Board of Metropolitan Sewerage Commissioners (1889-1901); the Metropolitan Water and Sewerage Board (1901-1919); and the Metropolitan District Commission (MDC) (since 1919), specifically its Water and Sewerage divisions. Upon abolition of the Metropolitan District Water Supply Commission (1926-1947), which constructed the Quabbin Reservoir, responsibility for that agency's construction projects and for those of the Water and Sewerage Divisions of the MDC was given to the MDC's Construction Division, known by 1972 as the Engineering Division.

From the description of Water and sewer construction photographs, 1876-1970. (Unknown). WorldCat record id: 180702962

eng

Latn

External Related CPF

Other Entity IDs (Same As)

Sources

Loading ...

Resource Relations

Loading ...

Internal CPF Relations

Loading ...

Languages Used

Subjects

Aqueducts

Reservoirs

Sewage disposal plants

Waterworks

Nationalities

Activities

Documenting sewage disposal construction

Documenting water supply systems construction

Occupations

Legal Statuses

Places

Massachusetts--Boston Metropolitan Area

as recorded (not vetted)

AssociatedPlace

Massachusetts

as recorded (not vetted)

AssociatedPlace

Convention Declarations

General Contexts

Structure or Genealogies

Mandates

Identity Constellation Identifier(s)

w6jd9ztp

43730626